Application of Drying Drum of Asphalt Mixing Equipment
November 9, 2022
1. Attach great importance to routine inspections

The drying cylinder of asphalt mixing equipment has been tested and inspected before the original factory, but it will be subject to shaking and vibration during the whole process of transportation to the construction site. A comprehensive inspection should be carried out before application: check whether all the anchor bolts have been twisted Check tightness; whether all key pins are reliably inserted; whether all drive equipment is adjusted according to the manufacturer's instructions; whether all pipeline connections are appropriate, and whether the tee joints can be trusted; whether the entire equipment is completely lubricated; Start the motor and check whether all parts can be stably rotated in the proper rotation direction; whether the air pressure gauge can work normally, whether the valve is adjusted to the correct working pressure; whether the ignition mechanism of the burner is available, and whether the gate valve is open.

LB2

2. Proper operation steps
After the asphalt mixing plant is started, it is recommended to control the machine and equipment manually at the beginning, and then switch to the automatic control system method after reaching the required production volume and pouring temperature. The stone should be dried with as stable a moisture content as possible to maintain a stable final temperature as the stone passes through the drying cylinder. If the stone material sent to the drying cylinder changes frequently, and the moisture content changes each time, the burner should be adjusted frequently.
3. Effective maintenance of asphalt mixing equipment
Tel: 4000-676-878
WhatsApp:+86 18224529750
Email: sales@sinoroader.com
Wechat: Sinoroader
Code: 461000
Address: No. 1001 Longxiang Industrial Park, Weidu District,XuChang,HeNan, China
Copyright © 2023 Henan Sinoroader heavy Industry Corporation. Amallink.com