The installation of
a concrete mixing plant is a very important step before the entire
production line is put into use. In fact, your concrete mixing plant can only be successfully installed if it meets these criteria.
Standard
1: The full set of concrete mixing stations must be located at the same
horizontal level, and there must be no shaking of any equipment parts
and unequal heights.
Standard
2: All equipment accessories (such as wire ropes, screws, body hooks,
hopper wheels, lifting ears, etc.) in the concrete mixing station must
not be rusted, rusted, broken, flattened, etc., and they must be
replaced with new ones of.
Standard
3: Wires and cables must use national standard lines to prevent
long-term operation of the concrete mixing station, which may cause
danger of cable thermal breakage.
Standard
4: The concrete mixing station should set “one machine, one gate, one
leak and one box” leakage protector with a parameter of 30M A × 0.1S,
and the insulation resistance value of the motor should be greater than
0.5MΩ; At two places, the instrumentation and indication signals of the
operation console are accurate and reliable. The transmission mechanism,
working device, clutch and brake should all be fastened, flexible and
reliable, and the protective cover should be complete.